HVAC Mechanical Work and Fees

Print
Press Enter to show all options, press Tab go to next option

The permit fee for all work covered by provisions of the Mechanical Code of the City shall be calculated based on estimated cost/value and nature of the work proposed using the following schedule:

  • The permit fee for all work covered by provisions of the Mechanical Code of the City shall be calculated based on estimated cost/value and nature of the work proposed.
  • "Estimated Costs" shall be calculated by totaling the cost/value- of all services, labor, materials, equipment and any other appliances or devices entering into and necessary to the execution and completion of the installation or the work using the following schedule:

Fee Schedule

Estimated Cost  New Work and Installations or
Unit Replacement or Additional/Alteration 
$500 - or less  $20.00 minimum 
$501 - $1,000  $30.00 minimum 
$1001 - $20,000  $30.00 plus $2.40 per hundred or part thereof  
$20,001 - $50,000   $486.00 plus $0.42 per hundred or part thereof 
$50,001 and over  $612.00 plus $0.24 per hundred or part thereof  

Permits issued to the owner of owner occupied single-family residences shall be charged a permit fee based on the above schedule with an additional 50% surcharge. (Ordinance No. 1998-51)

As Stated Bloomington City Code, Chapter 10, Section 108.11

HVAC Permit Application

HVAC Commercial Kitchen Hood Permit Application

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer